... Sequence of Operation
 
 
     
Clean drum and Roller Stone assembly thoroughly.   Place the drum on coupler and gently rotate till it is seated properly.
     
 
     
Place the roller holder assembly inside the drum as above. Ensure with the line diagram printed on arm.   Keep the knob in unlock position and close the arm. Rotate the knob gently to connect spring load and to lock the arm.
     
 
     
Pour a cup of water into the drum.   Set required Grinding Time as explained in Digital Timer and press ON / OFF switch to start the grinder.
     
 
     
Add the grinding medium in small quantities with adequate water and close the drum with hatch.   When set time is reached, grinder will come to halt automatically by giving beep sound during last 30 seconds.
     
 
     
Remove the Hatch. Rotate the knob opposite to release spring load and to unlock the arm. Swing the arm upwards.   Remove roller assembly and wipe down the batter.
     
 
     
Remove the drum and use required amount of batter. The rest can be stored in your refrigerator.    
     


ANGLER Technologies