| |
...
Sequence of Operation |
| |
|
|
|
| |
|
|
| Clean
drum and Roller Stone assembly thoroughly. |
|
Place
the drum on coupler and
gently rotate till it is seated properly. |
| |
|
|
|
|
|
| |
|
|
| Place
the roller holder assembly inside the drum as above.
Ensure
with the line diagram printed on arm. |
|
Keep
the knob in unlock position and close the arm.
Rotate the knob
gently to connect spring load
and to lock the arm. |
| |
|
|
|
|
|
| |
|
|
| Pour
a cup of water
into the drum. |
|
Set
required Grinding Time as explained in Digital
Timer
and press ON / OFF switch to start the grinder. |
| |
|
|
|
|
|
| |
|
|
| Add
the grinding medium in small
quantities with adequate
water and
close the drum with hatch. |
|
When
set time is reached, grinder
will come to halt
automatically by
giving beep sound
during last 30 seconds. |
| |
|
|
|
|
|
| |
|
|
| Remove
the Hatch. Rotate the knob
opposite to release spring load and to unlock the arm.
Swing
the arm upwards. |
|
Remove roller assembly and wipe down the batter. |
| |
|
|
|
|
|
| |
|
|
| Remove
the drum and use required amount of batter.
The rest can be
stored in your refrigerator. |
|
|
| |
|
|